重点语句释义:

Construction drawings and construction instructions must be in line with fire prevention regulations,and accident prevention requirements.

施工图纸和施工说明应符合防火、防事故的要求。

In the event of force majeure,this contract will be delayed and resume as soon as practicably possible.

如遇不可抗力因素,工期顺延,并尽早复工。

专业词汇:

Fire prevention regulations 防火规定

Accident prevention安全措施、事故预防

Force majeure不可抗力

Practicably切实可行地、实用地

施工项目英文代称有哪些(工程英语制定合同时)(1)

,